April 2010

Seafood in Sorrento And another month flies by...
However, it did start with some excellent Rn'R, a week in Sorrento, Italy. A little early to be guaranteed good weather but we were very lucky. The season there starts in the first week of April but it looked like they weren't in much of a hurry and were still assembling the decks and docks. One benefit was we never had to wait for a table but I would have preferred more activity. The Amalfi coast is stunning and walking around Positano would certainly keep you fit.

Hull port side with peel ply Then it was back to Sandfest round 2.
Having finished the sanding I gave the whole workshop a spring clean particularly the floor as now I'm doing the hull sides the material will inevitably drag on the floor and collect debris giving lumps and bumps in the laminate.
Then I cut 4 sections of peel ply for the hull side sheathing and rolled them onto cardboard tubes ready for use.