April 2015
April has seen consolidation on the slipway build and importantly the throwback on the top of the sea wall.
Here's the detailed drawing. The roll top is made from a section of mini guttering.
Here's the finished form work. Only 500mm long but if this works the next one will be 2.3m.
Here's the result.