November 2020

I mentioned a few of those distracting jobs that have slowed the boat build.
Here is a selection.

Adding an e-ink display to the tide clock I added an e-ink display to the tide clock to show the ambient pressure trend and actual tide height based on the current ambient pressure.

Adding an e-ink display to the tide clock

door repair Replacing the bottom of some external doors that had rotted away.

Moving the masterswitch After a lot of investigation I have concluded that the cranking problems I have experienced ever since buying this boat are due to excessively long cables from the battery to the master switch and back to the solenoid. The only solution was to move the master switch from the cockpit to the boot, a location directly above the battery and next to the solenoid.